Modules Checker

Full control over site health
with impact assessment on results.

Instantly find technical errors, track how changes affect rankings, traffic and sales, and build reports in 1 click.

Create your first project

Detailed
project dashboards and analytics of site health

Automated, continuous audit of your site. Checker catches critical failures and anomalies before they cost you visibility.

Checker project dashboard

Accuracy and ease of use

Turn SEO chaos into a system that runs on autopilot

Compare how much time and effort the usual routine takes and how easily Checker by REDHunt gets the job done.

Without Checker (the usual approach)

You hear about an SSL or site outage from your client

Lost traffic, rankings and client trust while a technical failure or a 500 error goes unnoticed for days.

Hours of manual error hunting

Hours of manually hunting for broken links (404/500), lost meta tags and deleted pages after a new site release.

No idea why your rankings changed

When you make changes to the site, it's unclear which of them drove results up or down.

With REDHunt Checker

Problem alerts within seconds

24/7 monitoring of SSL, 4xx/5xx errors, page changes and indexing with instant alerts.

Regular site health assessment

The automated checker scans your site regularly, instantly highlights critical errors and offers ready-made fixes.

A clear view of how changes affect your site

The service tracks every change on the site and its correlation with business metrics (rankings/traffic/sales).

Features

Powerful tools for any SEO task

Health monitoring

Technical audit and site health

Continuous monitoring of server responses (200 OK, 301/302 Redirects, 404 Not Found, 5xx Server Error). Automatic checks of Title and Description meta tags, H1–H6 headings, canonical URLs, indexing and main content.

Detection of 200+ technical errors

History of every change

Checks for blocked and indexed pages

Technical audit and site health

Traffic impact

Dynamics and rank monitoring

Measure how technical changes and tested hypotheses affect organic traffic. Compare keywords entering and leaving the Top on clear visual charts.

A combined chart of implemented changes against segmented traffic history.

Business metrics included — traffic, goals, leads, sales.

Dynamics and rank monitoring

Change history

URL card & precise diagnostics

A detailed breakdown of a specific page: server response code, indexing status, heading change history and linked keywords.

HTTP status & SSL

H1 / Title / structure tracking

URL card & precise diagnostics

Instant alerts

Alerts in the format you prefer

A flexible alert system for the channel you prefer. Add accounts and email addresses for your whole team.

Telegram

E-mail

Alerts in the format you prefer

For teams and SEO studios

Special features for scaling agencies

Custom task tagging

Create custom work lists and link them to reports in a couple of clicks for later analysis.

White Label reports

Personalization options for auto-generated client reports.

Error alert thresholds

Cut out the noise and get alerts only when metrics cross critical thresholds.

Fast data export

Export error results without losing structured relationships.

Instant demo check

Test Checker right now

Enter your site's domain to simulate an express scan of SSL, errors and indexing

Save resources

Numbers that save your budget

1 000 000+

keywords processed by the system every day with no delays

15+ hours

saved per SEO specialist every month on reports

Top 50

parsing depth of live Yandex and Google results

24 / 7

continuous monitoring of SSL and changes across your entire site network

Pricing and billing

Transparent pricing for any task

Freelance / Webmaster

1 240 990 ₽ / month

For specialists with 1–5 projects or small site networks.

Up to 5 active projects
Monitoring of up to 2 000 pages
24/7 SSL and error checks
Up to 5 000 rank checks
Basic Soft/Hard clustering
Choose Starter

Agency / PBN Network

9 990 7 990 ₽ / month

For SEO agencies and owners of large site networks.

Unlimited projects
Monitoring of 50 000+ pages
Full API access
Unbranded report export
Dedicated manager in Telegram
Request an agency demo

Answers to your questions

Frequently asked questions

Which results does the tool parse — live or from a database?

We parse live/XML Yandex results and live Google results for the selected region and device type (desktop / smartphone).

How does Checker help track the impact of site changes?

Checker records changes on your site and overlays them on ranking, traffic and conversion charts. For every hypothesis you can see what grew, what dropped and when it happened.

Can I set up my own report formats for clients?

Yes. The PRO and Agency plans include a template builder and White Label: the logo, colors and report blocks are set once and reused in auto-generation.

Ready to speed up your SEO routine and make your analytics more accurate?

Sign up now and get 1 000 000 free checks to fully test RedHunt Checker.

Try free for 14 days

Try Checker

Leave your email — we will open access and tell you how to check brand visibility.